Checkline TS2P Manual do Utilizador Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 15
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
–10 –
4.2 GAIN Adjustment
Requirement: ZERO adjustment carried out.
1. Thread the process material through the measuring and guide rollers, following
the material path symbol on the front of the sensor.
2. Hang a weight that corresponds to e.g. 95% of the tension range from the
process material.
3. Adjust the potentiometer, which you can reach through the GAIN hole in the
housing, with a screwdriver (with a point width of max. 1.9 mm) until the
display of the connected volt meter reads,
for example:
Sensor model TS2 - 200:
Weight 190 g = Display 0.950 V for TS2 standard version
or
Weight 190 g = Display 9.50 V for TS2 version with 10 V output signal.
WARNING: Do not insert the screwdriver at an angle as this may damage
the potentiometer.
4. Check the adjustments with a fresh portion of the process material and repeat
the procedure, if required, as described in Chapters 3.3.1 and 3.3.2.
!
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14 15

Comentários a estes Manuais

Sem comentários