Checkline BL2 Manual do Utilizador Página 3

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 15
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 2
© Electromatic Equipment Co., Inc.
-3-
2.0 MEASURING PROCEDURE BL2 WOOD CHIPS PROBE
1. For a correct measurement please ensure that the device has the same
temperature than the wood chips (+/-3°C). For that reason, let your humimeter
BL2 adjust to the surrounding temperature of the material for at least half an
hour before measuring.
2. Switch on the device: Press the
key for three
seconds.
3. Plug the probe of your BL2 wood chips probe straight
into the wood chips. It is not allowed to load the
measuring head incorrect or drop it down!
4. Plug in the sensor cable into the socket of the BL2. Take
care of the correct position and fix it with the knurled nut.
5. Change the calibration curve: Press one time the
key
and then the or key. The name of the calibration
curve can be seen at the head of the display.
6. Now the display shows the water content. Left hand
the temperature is displayed.
7. To save the results in the save menu press the
(
button). The storage was successful when the
number in front of the symbol
increased. To reach the
store menu please press until the appears.
8. To name the saved results press the
button.
9. Remove the BL2 probe straight with caution and clean the measuring head.
Risk of injury by measuring head!
Keep away from children!
Vista de página 2
1 2 3 4 5 6 7 8 ... 14 15

Comentários a estes Manuais

Sem comentários